News List

Print
Press Enter to show all options, press Tab go to next option

County Road 31 Left-Turn Lane Construction Starts July 22

Post Date:07/17/2019 5:08 PM

Press Release

(Woodland, CA) – In accordance with Yolo County’s encroachment permit conditions that require safe ingress to the Indian Health Services Sacred Oaks Healing Center, currently under construction on County Road 31 west of Davis, Genesis Design and Development, with Granite Construction as their subcontractor, will be constructing a left-turn lane on County Road 31 starting on July 22.

The construction will occur within a 1,500-foot length of road, located just east of 33250 County Road 31. The road will remain open with two lane traffic control until the expected completion of the project on August 16. Some construction methods will require temporary one lane traffic control with delays up to 15 minutes.

Access to residents and properties will be maintained during the construction. For more information, contact Antonina Rivera with Genesis Design and Development at (316) 293-6559 or riveraantonina@gmail.com.

Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer